More information about a potential PacifiCorp energy facility in the Valley Falls and Winter Rim areas was obtained by the Lake County Examiner.

The company, through its 2021 renewable energy plan, has filed a notice with the Federal Energy Regulatory Commission (FERC) to conduct feasibility studies on 11 locations throughout its territory to build new closed loop hydroelectric facilities.